Moving from principles to action for energy supply that mitigates against climate change requires a long-term perspective. Energy infrastructure takes time to build up; new energy technologies take time to develop. Policy shifts often also need many years to take effect. In most world regions the transformation from fossil to renewable energies will require additional investment and higher supply costs over about twenty years

download the report

Windpark Parndorf

Technology Onshore Wind
Source N/A
Mode Electricity
Policy Green power
Country Austria
State Niederösterreich
City Parndorf - 40km southeast of Vienna
Description The project is located 40 km southeast of the Vienna (Austria).
8 GE 1.5 sl turbines have been connect to the grid in December 2004.
The wind farm "Parndorf 2" is a joint project of the Austrian green power company "oekostrom AG", the German Planet energy GmbH (a 100% subsidiary of the green power utility Greepeace energy eG) and Stadtwerke Hartberg.
The wind farm generates enough energy to supply 8.300 Austrian households with electricity and saves approx 15,500 tons CO2 annually.
Project development oekostrom AG,Stadtwerke Hartberg and Planet energy
Total investment
Production cost / Feed-in tarif

Contact details
Website http://www.greenpeace-energy.de/kraftwerke_wind_parndorf2.php http://www.oekostrom.at/www/getFile.php?id=556&parent=0
Telephone
E-mail info@planet-energy.de, office@oekostrom.at
Technical details
Installed capacity (8 X 1,5 MW) 12 MW
Annual generation 27,2 million kWh
Number of household that can be supplied by produced electricity 8.300
Annual CO2 saving in Tons of CO2 per year 15.500
Grid Ongrid
Manufacturer GE 1.5 sl
Operator oekostrom produktions GmbH & Co. KG