Energy Blue Print
Scenarios for a future energy supply

Moving from principles to action for energy supply that mitigates against climate change requires a long-term perspective. Energy infrastructure takes time to build up; new energy technologies take time to develop. Policy shifts often also need many years to take effect. In most world regions the transformation from fossil to renewable energies will require additional investment and higher supply costs over about twenty years

download the report

Windfarm Soltau

Technology Onshore Wind
Source N/A
Mode Electricity
Policy Feedin-tarifs
Country Germany
State Lower Saxony
City Soltau
Description Three wind turbines have been installed in March 2006, and connected to the grid in April 2006.
Project development Planet energy GmbH
Total investment 3,7 million Euro
Production cost / Feed-in tarif

Contact details
Website www.planet-energy.de
Telephone +49 40 808 110 770
E-mail info@planet-energy.de
Technical details
Installed capacity (3 X 1,3 MW) = 3,9 MW
Annual generation 5400 MWh
Number of household that can be supplied by produced electricity 1,500
Annual CO2 saving in Tons of CO2 per year 2860
Grid Ongrid
Manufacturer AN Bonus Windenergie GmbH
Operator Planet energy GmbH